[IPP] Re: Add Close-Job to JPS2 [and job-delay-output(-until)]

[IPP] Re: Add Close-Job to JPS2 [and job-delay-output(-until)]

Ira McDonald blueroofmusic at gmail.com
Tue Feb 9 19:22:37 UTC 2010


Hi Tom,

We are very short of time for mainstream IPP WG topics
tomorrow (3:45 MST Introductions through 5:00 MST end).

I think we should talk about Close-Job and "job-delay-xxx"
tomorrow, but not look at mockups - the MFD Overall spec
already defines "job-delay-xxx", so we should cohere with
those definitions (to be removed and replaced with a mere
reference to JPS2).

Ira McDonald (Musician / Software Architect)
Chair - Linux Foundation Open Printing WG
Co-Chair - TCG Hardcopy WG
IETF Designated Expert - IPP & Printer MIB
Blue Roof Music/High North Inc
email: blueroofmusic at gmail.com
winter:
  579 Park Place  Saline, MI  48176
  734-944-0094
summer:
  PO Box 221  Grand Marais, MI 49839
  906-494-2434



On Tue, Feb 9, 2010 at 2:17 PM, Tom Hastings <tom.hastings at verizon.net> wrote:
> Ira,
>
> Sounds like we should add to the IPP f2f agenda for tomorrow:
>
> 1. Whether or not to add Close-Job operation to JPS2.
> 2. Whether or not to add "job-delay-output" and "job-delay-output-until" Job
> Template attributes to JPS2.
>
> Should I make a separate straw horse draft of just these additions so we can
> talk about them at the f2f?
>
> Tom
>
>
>
> -----Original Message-----
> From: Ira McDonald [mailto:blueroofmusic at gmail.com]
> Sent: Tuesday, February 09, 2010 09:49
> To: ipp at pwg.org; Tom Hastings; Michael R Sweet; Ira McDonald
> Subject: Add Close-Job to JPS2
>
> Hi,
>
> The MFD WG has identified that a first class Close-Job
> operation (as opposed to hiding it in Create-Job and
> Send-Document with a boolean flag) is desirable for
> many Services (to allow clean streaming, for example).
>
> We should add Close-Job (which triggers Validate-Job
> internally) to JPS2.
>
> Cheers,
> - Ira
>
> Ira McDonald (Musician / Software Architect)
> Chair - Linux Foundation Open Printing WG
> Co-Chair - TCG Hardcopy WG
> IETF Designated Expert - IPP & Printer MIB
> Blue Roof Music/High North Inc
> email: blueroofmusic at gmail.com
> winter:
>  579 Park Place  Saline, MI  48176
>  734-944-0094
> summer:
>  PO Box 221  Grand Marais, MI 49839
>  906-494-2434
> [TH> ]
> -----Original Message-----
> From: Ira McDonald [mailto:blueroofmusic at gmail.com]
> Sent: Tuesday, February 09, 2010 09:53
> To: Michael Sweet; Ira McDonald
> Cc: ipp at pwg.org; Tom Hastings
> Subject: Re: Add job-delay-output(-until) to JPS2
>
> Hi Mike,
>
> We are NOT even in WG last call - we are in Prototype status,
> waiting for evidence of prototyping BEFORE entering WG last
> call.
>
> And yes, we are allowed to add functionality in either WG last
> call or PWG Last Call (but NOT during PWG Formal Vote).
>
> Cheers,
> - Ira
>
> Ira McDonald (Musician / Software Architect)
> Chair - Linux Foundation Open Printing WG
> Co-Chair - TCG Hardcopy WG
> IETF Designated Expert - IPP & Printer MIB
> Blue Roof Music/High North Inc
> email: blueroofmusic at gmail.com
> winter:
>  579 Park Place  Saline, MI  48176
>  734-944-0094
> summer:
>  PO Box 221  Grand Marais, MI 49839
>  906-494-2434
>
>
>
> On Tue, Feb 9, 2010 at 12:39 PM, Michael Sweet <msweet at apple.com> wrote:
>> We certainly can, although I'm not sure of the process issues - are we
>> allowed to add new content during WG last call?
>> On Feb 9, 2010, at 9:30 AM, Ira McDonald wrote:
>>
>> Hi,
>>
>> The MFD WG has defined a new pair of attributes
>> similar to job-hold-until(-time), but with somewhat
>> different semantics.
>>
>> The new attributes ALLOW Job processing (e.g.,
>> interpreting the Job) but DELAY any actual output.
>>
>> They are currently the only NEW attributes that are
>> defined only in the MFD Overall spec.
>>
>> However, Pete Zehler confirms that Xerox already
>> has implementations of this delay functionality.
>>
>> So we should add them to JPS2, right?
>>
>> Cheers,
>> - Ira (IPP/2.0 co-editor)
>>
>> Ira McDonald (Musician / Software Architect)
>> Chair - Linux Foundation Open Printing WG
>> Co-Chair - TCG Hardcopy WG
>> IETF Designated Expert - IPP & Printer MIB
>> Blue Roof Music/High North Inc
>> email: blueroofmusic at gmail.com
>> winter:
>>  579 Park Place  Saline, MI  48176
>>  734-944-0094
>> summer:
>>  PO Box 221  Grand Marais, MI 49839
>>  906-494-2434
>>
>> ___________________________________________________
>> Michael Sweet, Senior Printing System Engineer
>>
>>
>>
>
>

-- 
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.




More information about the ipp mailing list