Hi,
I have just posted another Interim draft of IPP System Service for
review during the IPP WG call this week and Virtual PWG F2F:
http://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippsystem10-20161101-rev.pdf
- PDF with line numbers and redlines
http://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippsystem10-20161101-rev.docx
- MS Word source with line numbers and redlines
Summary: All pending edits from 19 October 2016 discussion.
Cheers,
- Ira
-------------------------------
Change History:
1 November 2016
- Interim draft – changes per IPP WG discussion on 19 October 2016
- revised prologue to add List of Figures
- revised section 4.6 Resource Object and section 5.7 Resource Status
Attributes to add forward references to Figure 1 in section 7.7.8
resource-state for Resource life cycle
- revised section 7.1 IPP Operation Attributes, section 7.3 System Status
Attributes, and section 7.7 Resource Status Attributes to accept previously
deleted sections for readability
- revised section 7.7.8 resource-state to add Figure 1 IPP Resource Object
Life Cycle
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.pwg.org/pipermail/ipp/attachments/20161101/4902842e/attachment.html>