[IPP] I've uploaded v21 of JPS2 to have the new Figures: for review Monday, March 29 at IPP WG telecon

[IPP] I've uploaded v21 of JPS2 to have the new Figures: for review Monday, March 29 at IPP WG telecon

Tom Hastings tom.hastings at verizon.net
Mon Mar 29 07:21:11 UTC 2010


I've updated the Figures and made a v21:

 

ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippjobprinterext10-v21-20100328-rev.pdf

ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippjobprinterext10-v21-20100323-rev.doc

 

The .PDF doesn't have hot links.

 

>From the change log:

 


17.128 March 2010 (v21)


1.       Figure 1: Activity Diagram for "job-delay-output-until": Added this
Figure.

2.       Figure 2: Activity Diagram for "job-delay-output-until-time": Added
this Figure.

3.       Figure 3: Activity Diagram for "job-hold-until-time": Redrew this
Figure with MS-WORD Drawing.  Fixed two bugs:

a.       horizontal branch should be <= and vertical branch >, i.e., do NOT
hold the job if the specified time has exactly arrived.

b.      The "job-hold-until-specified' should NOT be set in
"job-state-reasons" if the time has arrived when other hold reasons apply,
so only set "job-state-reasons" if the time has NOT yet arrived by adding
extra box.

 

Tom

 

  _____  

From: ipp-bounces at pwg.org [mailto:ipp-bounces at pwg.org] On Behalf Of Tom
Hastings
Sent: Tuesday, March 16, 2010 12:40
To: ipp at pwg.org
Subject: [IPP] I've uploaded v20 of JPS2 edited during the IPP WG
telecon,March 15

 

I've uploaded v20 of JPS2 edited during the IPP WG telecon, March 15 along
with the updated log section afterwards.  Find the documents at:

 

Comments and revisions:

ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippjobprinterext10-v20-20100315-rev.pdf

ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippjobprinterext10-v20-20100315-rev.doc

 

No comments no revisions:

ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippjobprinterext10-v20-20100315.pdf

 

Comments and no revisions:

ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippjobprinterext10-v20-20100315.doc

 

I'll try to post another version with the Transition Diagrams added before
the next meeting, Monday, March 29, 4 PM EDT = 1 PM PDT.

 

Tom

 


-- 
This message has been scanned for viruses and 
dangerous content by  <http://www.mailscanner.info/> MailScanner, and is 
believed to be clean. 


-- 
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.pwg.org/pipermail/ipp/attachments/20100329/e87afde6/attachment-0001.html>


More information about the ipp mailing list