All,
Below is the table of contents for the IPP Bake-Off outline. I have some
additional updates to make to the document. I will post the document as
soon as possible.
I intend to hold a teleconference for IPP Bake-Off content and planning on
August 16 at the usual IPP teleconference time. I don't know yet if
Carl-Uno is going to hold an IPP teleconference or if he has any time on the
agenda for the Bake-Off item. If there is a conflict we will set another
time. I plan to use the phone conference to set the content and priorities
for the Bake-Off as well as content of the plan and resolve outstanding
issues. Interested parties are urged to attend. Details will be sent out
by cob Monday August 14.
Pete
____________________________________________________________________________
___________
1 General 2
1.1 Common restrictions for test purposes 2
1.2 Test print files 3
1.3 Result processing and documentation 3
1.3.1 Anonymity 3
1.3.2 Test data collection method 3
1.3.3 Results determination 3
1.3.4 Output 3
2 Procedure 4
2.1 IPP connectivity and basic printing 4
2.2 Version Interoperability 5
2.3 Notification Registration and Delivery Methods 5
2.4 Firewall and Proxy Interactions 5
2.5 Authentication and Security 5
3 Sample Tables and Checklists 5
3.1 IPP Components matrix 5
3.2 Print Job interoperability matrix 6
3.3 Version interoperability Table 6
3.4 Notification Table 10
3.5 Authentication & Security Table 10
3.6 Firewall Table 10
4 Issues 11
Peter Zehler
XEROX
Xerox Architecture Center
Email: Peter.Zehler at usa.xerox.com
Voice: (716) 265-8755
FAX: (716) 265-8792
US Mail: Peter Zehler
Xerox Corp.
800 Phillips Rd.
M/S 139-05A
Webster NY, 14580-9701