DISCUSSIONS: |
- From 5/14/97 Meeting in San Diego
- Terminology of Device Discovery/Service Discovery (Brian Batchelder)
- Proposal for initial Config ROM for Device Discovery (Brian Batchelder)
- 1284.4 over SBP-2 (Alan)
- From 6/23/97 Meeting in Nashua
- 1) 6/24/97 - Locate the web site or electronic copy of the Disk Boys Command Descriptor Block document for SCSI-3
(Greg Leclair) - Status: Done
ftp://fission.dt.wdc.com/pub/standards/sbp/incoming/
- 2) 6/24/97 - 1394 PWG "P1394.x Printing Protocol" Requirements document. (Brian Batchelder)
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema)
- 4) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema)
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 6) 6/24/97 - Discovery PAR (Greg Leclair)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)
- 8) 6/24/97 Research FCP Implementations, does it meet the PWG requirements (TBD)
- From 8/4/97 Meeting in Redmond, WA
- 2) 6/24/97 - 1394 PWG "P1394.x Printing Protocol" Requirements document. (Brian Batchelder)
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 4) 6/24/97 - Research SBP-2 Implementations, does it meet the PWG requirements (Alan Berkema) Status: Done
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 6) 6/24/97 - Discovery PAR (Greg Leclair) Status: Done
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 8) 6/24/97 Research FCP Implementations, does it meet the PWG requirements (Atsushi Nakamura, Lee Farrell) Status: Done
- 9) 8/4/97 - Function Discovery Proposal (PWG-C & PWG Unified draft) (Ats Nakamura, Greg Leclair, Greg Shue, Kazuhiro Hirata, Brian Batchelder) - Due Date: 8/15/97 or 8/16/97 - Status: New
- Draft that is suitable for editorial inclusion in IEEE 1212 draft.
- Also identify clauses in 1212 that need to be modified.
- glossary
- existing changes
- new sections
- List of 1394 specific issues
- List of unit architecture issues
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: New
- From 9/15/97 Meeting in Atlanta, GA
- 2) 6/24/97 - 1394 PWG "P1394.x Printing Protocol" Requirements document. (Brian Batchelder)
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 9) 8/4/97 - Function Discovery Proposal (PWG-C & PWG Unified draft) (Ats Nakamura, Greg Leclair, Greg Shue, Kazuhiro Hirata, Brian Batchelder) - Due Date: 8/15/97 or 8/16/97 - Status: Done
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: New
- 12) 9/16/97 - FDS sub-group to meet on 9/17 and begin revising FDS doc. (Nakamura, Nagasaka, Murakami, Thrasher, LeClair) Status: New
- Draft that is suitable for editorial inclusion in IEEE 1212 draft.
- Also identify clauses in 1212 that need to be modified.
- glossary
- existing changes
- new sections
- List of 1394 specific issues
- List of unit architecture issues
- 13) 9/16/97 - Requirements doc to be published ASAP (Shue, Batchelder) Status: New
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: New
- From October 27th Meeting in Boulder, CO
- 2) 6/24/97 - 1394 PWG "P1394.x Printing Protocol" Requirements document. (Brian Batchelder)
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: New
- 12) 9/16/97 - FDS sub-group to meet on 9/17 and begin revising FDS doc. (Nakamura, Nagasaka, Murakami, Thrasher, LeClair) Status: Done
- 13) 9/16/97 - Requirements doc to be published ASAP (Shue, Batchelder) Status: Done
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: In Process
- 15) 9/16/97 - 1284.4 over SBP-2 device profile Doc to be published by Dec. '97 mtg. (Turner, LeClair, Berkema, Nagasaka) Status: New
- From March 2nd, 1998 Meeting in Austin, TX
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: In Process
- 16) 3/02/98 - The Comparison Chart(s) will be posted - (Batchelder) Status: New
- 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
- 18) 3/02/98 - Review/present next revision of Imaging Profile - (Shue,Berkema) Status: New
- 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
- From July 6th, 1998 Meeting in Monterey, CA
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: In Process
- 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
- 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
- 20) 07/06/98 - sequence # [Shue] Status: New
- 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
- 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
- 23) 07/06/98 - Timeout Values - [Berkema] Status: New
- 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
- From August 17th, 1998 Meeting in Toronto
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: In Process
- 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
- 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
- 20) 07/06/98 - sequence # [Shue] Status: New
- 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
- 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
- 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
- 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
- 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: New
- 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: New
- 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: New
- 28) 08/17/98 - Proposal for acquisition of a 1394 PWG OUI from the IEEE RAC. - [LeClair] Status: New
- From September 28th, 1998 Meeting in Savannah, GA
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: In Process
- 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
- 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
- 20) 07/06/98 - sequence # [Shue] Status: New
- 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
- 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
- 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
- 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
- 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
- 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: New
- 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Pending
- 28) 08/17/98 - Proposal for acquisition of a 1394 PWG OUI from the IEEE RAC. - [LeClair] Status: Done
- 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
- 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: New
- 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
- 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: New
- From December 14th, 1998 Meeting in San Diego, CA
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: In Process
- 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
- 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
- 20) 07/06/98 - sequence # [Shue] Status: New
- 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
- 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
- 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
- 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
- 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
- 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: New
- 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Pending
- 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
- 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: New
- 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
- 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: New
- 33) 12/14/98 - Message Request/Response proposal for T2I service request. (Group) Status: New
- 34) 12/14/98 - Service Connection String guidelines (like IANA?) . (Batchelder) Status: New
- 35) 12/14/98 - Feedback on Unsolicited Status Implementation on Windows 2000. (Fenelon) Status: New
- 36) 12/14/98 - Out of Band Data proposal requiring Tag Bit. (Batchelder) Status: New
- 37) 12/14/98 - Matched Request / Reply ORBS and Command Vs. Action alternative proposal. (Johansson) Status: New
- Update of issue from January 21st, 1998 Meeting in Maui, HI
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: In Process
- 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
- 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
- 20) 07/06/98 - sequence # [Shue] Status: New
- 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
- 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
- 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
- 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
- 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
- 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: New
- 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Pending
- 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
- 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: New
- 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
- 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: New
- 33) 12/14/98 - Message Request/Response proposal for T2I service request. (Group) Status: Pending
- 34) 12/14/98 - Service Connection String guidelines (like IANA?) . (Batchelder) Status: Pending
- 35) 12/14/98 - Feedback on Unsolicited Status Implementation on Windows 2000. (Fenelon) Status: Pending
- 36) 12/14/98 - Out of Band Data proposal requiring Tag Bit. (Batchelder) Status: Pending
- 37) 12/14/98 - Matched Request / Reply ORBS and Command Vs. Action alternative proposal. (Johansson) Status: Pending
- 38) 1/28/99 - Socket to Transport command set mapping document. (Batchelder, Fenelon) Status: New
- Update of issue from March 1st, 1999 Meeting in Miami, FL
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: Pending
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: In Process
- 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: Pending
- 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: Pending
- 20) 07/06/98 - sequence # [Shue] Status: Pending
- 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: Pending
- 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: Pending
- 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
- 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: Pending
- 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
- 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: Pending
- 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Ongoing
- 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
- 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: Pending
- 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
- 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: Pending
- 33) 12/14/98 - Message Request/Response proposal for T2I service request. (Group) Status: Pending
- 34) 12/14/98 - Service Connection String guidelines (like IANA?) . (Batchelder) Status: Done
- 35) 12/14/98 - Feedback on Unsolicited Status Implementation on Windows 2000. (Fenelon) Status: Pending
- 36) 12/14/98 - Out of Band Data proposal requiring Tag Bit. (Batchelder) Status: Done
- 37) 12/14/98 - Matched Request / Reply ORBS and Command Vs. Action alternative proposal. (Johansson) Status: Pending
- 38) 1/28/99 - Socket to Transport command set mapping document. (Batchelder, Fenelon) Status: Pending
- 39) 3/1/99 - Integrate drawings, pwgpr49.pdf, idt_r01.pdf and pwgpro55.pdf by the next meeting. (Berkema, Johansson) Status: New
- 40) 3/1/99 - Integrate ORB Sequence ID and History proposals. (Johansson) Status: New
- Update of issue from April 13th, 1999 Meeting in New Orleans, LA
- 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
- 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
- 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
- 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: Pending
- 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
- 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at
least 1 week prior to Boulder meeting for consideration by WG.
Comparison and updated proposals should be sent to Greg LeClair
for posting by 10/20. (All proposal submitters) Status: In Process
- 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: Pending
- 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: Pending
- 20) 07/06/98 - sequence # [Shue] Status: Pending
- 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: Pending
- 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: Pending
- 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
- 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: Pending
- 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
- 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: Pending
- 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Ongoing
- 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
- 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: Pending
- 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
- 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: Pending
- 33) 12/14/98 - Message Request/Response proposal for T2I service request. (Group) Status: Pending
- 35) 12/14/98 - Feedback on Unsolicited Status Implementation on Windows 2000. (Fenelon) Status: Pending
- 37) 12/14/98 - Matched Request / Reply ORBS and Command Vs. Action alternative proposal. (Johansson) Status: Pending
- 38) 1/28/99 - Socket to Transport command set mapping document. (Batchelder, Fenelon) Status: Pending
- 39) 3/1/99 - Integrate drawings, pwgpr49.pdf, idt_r01.pdf and pwgpro55.pdf by the next meeting. (Berkema, Johansson) Status: Pending
- 40) 3/1/99 - Integrate ORB Sequence ID and History proposals. (Johansson) Status: Pending
|