ISSUE NO.:970514-010NAME:Proposals lists and volunteers.STATUS:TBD
RESOLUTION:DATE:TBD
ORIGIN:05/14/97 Meeting in San Diego
DESCRIPTION:Many times people volunteered for proposals and we moved on without them. This captures those proposals and whether they are still needed or were in fact provided by the original volunteer or another working group member.
DISCUSSIONS:
  • From 5/14/97 Meeting in San Diego
    • Terminology of Device Discovery/Service Discovery (Brian Batchelder)
    • Proposal for initial Config ROM for Device Discovery (Brian Batchelder)
    • 1284.4 over SBP-2 (Alan)
  • From 6/23/97 Meeting in Nashua
    • 1) 6/24/97 - Locate the web site or electronic copy of the Disk Boys Command Descriptor Block document for SCSI-3
      (Greg Leclair) - Status: Done
      ftp://fission.dt.wdc.com/pub/standards/sbp/incoming/
    • 2) 6/24/97 - 1394 PWG "P1394.x Printing Protocol" Requirements document. (Brian Batchelder)
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema)
    • 4) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema)
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 6) 6/24/97 - Discovery PAR (Greg Leclair)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)
    • 8) 6/24/97 Research FCP Implementations, does it meet the PWG requirements (TBD)
  • From 8/4/97 Meeting in Redmond, WA
    • 2) 6/24/97 - 1394 PWG "P1394.x Printing Protocol" Requirements document. (Brian Batchelder)
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 4) 6/24/97 - Research SBP-2 Implementations, does it meet the PWG requirements (Alan Berkema) Status: Done
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 6) 6/24/97 - Discovery PAR (Greg Leclair) Status: Done
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 8) 6/24/97 Research FCP Implementations, does it meet the PWG requirements (Atsushi Nakamura, Lee Farrell) Status: Done
    • 9) 8/4/97 - Function Discovery Proposal (PWG-C & PWG Unified draft) (Ats Nakamura, Greg Leclair, Greg Shue, Kazuhiro Hirata, Brian Batchelder) - Due Date: 8/15/97 or 8/16/97 - Status: New
      • Draft that is suitable for editorial inclusion in IEEE 1212 draft.
      • Also identify clauses in 1212 that need to be modified.
        • glossary
        • existing changes
        • new sections
        • List of 1394 specific issues
        • List of unit architecture issues
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: New
  • From 9/15/97 Meeting in Atlanta, GA
    • 2) 6/24/97 - 1394 PWG "P1394.x Printing Protocol" Requirements document. (Brian Batchelder)
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 9) 8/4/97 - Function Discovery Proposal (PWG-C & PWG Unified draft) (Ats Nakamura, Greg Leclair, Greg Shue, Kazuhiro Hirata, Brian Batchelder) - Due Date: 8/15/97 or 8/16/97 - Status: Done
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: New
    • 12) 9/16/97 - FDS sub-group to meet on 9/17 and begin revising FDS doc. (Nakamura, Nagasaka, Murakami, Thrasher, LeClair) Status: New
      • Draft that is suitable for editorial inclusion in IEEE 1212 draft.
      • Also identify clauses in 1212 that need to be modified.
        • glossary
        • existing changes
        • new sections
        • List of 1394 specific issues
        • List of unit architecture issues
    • 13) 9/16/97 - Requirements doc to be published ASAP (Shue, Batchelder) Status: New
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: New
  • From October 27th Meeting in Boulder, CO
    • 2) 6/24/97 - 1394 PWG "P1394.x Printing Protocol" Requirements document. (Brian Batchelder)
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: New
    • 12) 9/16/97 - FDS sub-group to meet on 9/17 and begin revising FDS doc. (Nakamura, Nagasaka, Murakami, Thrasher, LeClair) Status: Done
    • 13) 9/16/97 - Requirements doc to be published ASAP (Shue, Batchelder) Status: Done
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: In Process
    • 15) 9/16/97 - 1284.4 over SBP-2 device profile Doc to be published by Dec. '97 mtg. (Turner, LeClair, Berkema, Nagasaka) Status: New
  • From March 2nd, 1998 Meeting in Austin, TX
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: In Process
    • 16) 3/02/98 - The Comparison Chart(s) will be posted - (Batchelder) Status: New
    • 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
    • 18) 3/02/98 - Review/present next revision of Imaging Profile - (Shue,Berkema) Status: New
    • 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
  • From July 6th, 1998 Meeting in Monterey, CA
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: In Process
    • 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
    • 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
    • 20) 07/06/98 - sequence # [Shue] Status: New
    • 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
    • 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
    • 23) 07/06/98 - Timeout Values - [Berkema] Status: New
    • 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
  • From August 17th, 1998 Meeting in Toronto
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: In Process
    • 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
    • 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
    • 20) 07/06/98 - sequence # [Shue] Status: New
    • 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
    • 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
    • 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
    • 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
    • 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: New
    • 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: New
    • 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: New
    • 28) 08/17/98 - Proposal for acquisition of a 1394 PWG OUI from the IEEE RAC. - [LeClair] Status: New
  • From September 28th, 1998 Meeting in Savannah, GA
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: In Process
    • 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
    • 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
    • 20) 07/06/98 - sequence # [Shue] Status: New
    • 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
    • 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
    • 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
    • 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
    • 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
    • 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: New
    • 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Pending
    • 28) 08/17/98 - Proposal for acquisition of a 1394 PWG OUI from the IEEE RAC. - [LeClair] Status: Done
    • 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
    • 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: New
    • 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
    • 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: New
  • From December 14th, 1998 Meeting in San Diego, CA
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: In Process
    • 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
    • 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
    • 20) 07/06/98 - sequence # [Shue] Status: New
    • 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
    • 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
    • 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
    • 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
    • 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
    • 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: New
    • 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Pending
    • 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
    • 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: New
    • 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
    • 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: New
    • 33) 12/14/98 - Message Request/Response proposal for T2I service request. (Group) Status: New
    • 34) 12/14/98 - Service Connection String guidelines (like IANA?) . (Batchelder) Status: New
    • 35) 12/14/98 - Feedback on Unsolicited Status Implementation on Windows 2000. (Fenelon) Status: New
    • 36) 12/14/98 - Out of Band Data proposal requiring Tag Bit. (Batchelder) Status: New
    • 37) 12/14/98 - Matched Request / Reply ORBS and Command Vs. Action alternative proposal. (Johansson) Status: New
  • Update of issue from January 21st, 1998 Meeting in Maui, HI
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: New
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: In Process
    • 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: New
    • 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: New
    • 20) 07/06/98 - sequence # [Shue] Status: New
    • 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: New
    • 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: New
    • 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
    • 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: New
    • 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
    • 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: New
    • 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Pending
    • 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
    • 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: New
    • 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
    • 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: New
    • 33) 12/14/98 - Message Request/Response proposal for T2I service request. (Group) Status: Pending
    • 34) 12/14/98 - Service Connection String guidelines (like IANA?) . (Batchelder) Status: Pending
    • 35) 12/14/98 - Feedback on Unsolicited Status Implementation on Windows 2000. (Fenelon) Status: Pending
    • 36) 12/14/98 - Out of Band Data proposal requiring Tag Bit. (Batchelder) Status: Pending
    • 37) 12/14/98 - Matched Request / Reply ORBS and Command Vs. Action alternative proposal. (Johansson) Status: Pending
    • 38) 1/28/99 - Socket to Transport command set mapping document. (Batchelder, Fenelon) Status: New
  • Update of issue from March 1st, 1999 Meeting in Miami, FL
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: Pending
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: In Process
    • 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: Pending
    • 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: Pending
    • 20) 07/06/98 - sequence # [Shue] Status: Pending
    • 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: Pending
    • 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: Pending
    • 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
    • 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: Pending
    • 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
    • 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: Pending
    • 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Ongoing
    • 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
    • 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: Pending
    • 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
    • 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: Pending
    • 33) 12/14/98 - Message Request/Response proposal for T2I service request. (Group) Status: Pending
    • 34) 12/14/98 - Service Connection String guidelines (like IANA?) . (Batchelder) Status: Done
    • 35) 12/14/98 - Feedback on Unsolicited Status Implementation on Windows 2000. (Fenelon) Status: Pending
    • 36) 12/14/98 - Out of Band Data proposal requiring Tag Bit. (Batchelder) Status: Done
    • 37) 12/14/98 - Matched Request / Reply ORBS and Command Vs. Action alternative proposal. (Johansson) Status: Pending
    • 38) 1/28/99 - Socket to Transport command set mapping document. (Batchelder, Fenelon) Status: Pending
    • 39) 3/1/99 - Integrate drawings, pwgpr49.pdf, idt_r01.pdf and pwgpro55.pdf by the next meeting. (Berkema, Johansson) Status: New
    • 40) 3/1/99 - Integrate ORB Sequence ID and History proposals. (Johansson) Status: New
  • Update of issue from April 13th, 1999 Meeting in New Orleans, LA
    • 3) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks. (Alan Berkema) Status: In progress
    • 5) 6/24/97 - Transport research on SBP-2 Printer Command Descriptor Blocks with respect to Canon proposal.(Shigeru Ueda)
    • 7) 6/24/97 Common Image Data Format (Atsushi Nakamura, Lee Farrell)Status:?
    • 10) 8/5/97 - Modified SBP-2 lite proposal native 1394 space (Greg LeClair, Alan Berkema) - Due Date: 8/15/97 or 8/16/97 - Status: Pending
    • 11) 8/5/97 - Begin Increased Participation in IP1394 to insure that it will work well for printing. Invite Myron Hattig to September Atlanta meeting. (Alan Berkema) Status: In progress
    • 14) 9/16/97 - Comparison of Proposals to Requirements doc to be published at least 1 week prior to Boulder meeting for consideration by WG. Comparison and updated proposals should be sent to Greg LeClair for posting by 10/20. (All proposal submitters) Status: In Process
    • 17) 3/02/98 - Application discussion presentation for next meeting - (Turner) Status: Pending
    • 19) 3/02/98 - Scenarios for print/scan/fax presentation for next meeting - (Lasslo,Shue) Status: Pending
    • 20) 07/06/98 - sequence # [Shue] Status: Pending
    • 21) 07/06/98 - sequence # seeding, abort task interactions, notify bits and gaps in sequence ID, Open/Close CMDs - [Turner, Shue] Status: Pending
    • 22) 07/06/98 - parameters and encodings, negotiated buffer sizes, mode and completion policy - [Morford] Status: Pending
    • 23) 07/06/98 - Timeout Values - [Berkema] Status: In process
    • 24) 07/06/98 - Error recovery issues on Microsoft stack - [Fuller] Status: Pending
    • 25) 08/17/98 - Description clarifying the differences between datagram- and datastream-based services. - [Batchelder] Status: Pending
    • 26) 08/17/98 - Alan said that he will update and issue a new version of the Profile by September 10. - [Berkema] Status: Pending
    • 27) 08/17/98 - Maintain a prioritized List of Active Issues for tracking and reference within the group. - [LeClair] Status: Ongoing
    • 29) 09/28/98 - Figure 3 in Section 8.4, Initiator Model – Drawings showing a progression of detail in the communication flow between the client and server: client/server, 1394 PWG, "SBP-2 cloud", and "SBP-2 details". (Isoda/Berkema) Status: Pending
    • 30) 09/28/98 - The Profile document should include a section that describes the interface between the transport client and the transport. (Batchelder) Status: Pending
    • 31) 09/28/98 - Agreement needed on a method for encoding a new parameter that indicates that "the Initiator will maintain data buffer content integrity across Bus Resets" - to address proposal made on topic of Recovery in August. (Group) Status: Pending
    • 32) 11/09/98 - Paper describing new Connection algorithm and it's integration into profile. (Berkema) Status: Pending
    • 33) 12/14/98 - Message Request/Response proposal for T2I service request. (Group) Status: Pending
    • 35) 12/14/98 - Feedback on Unsolicited Status Implementation on Windows 2000. (Fenelon) Status: Pending
    • 37) 12/14/98 - Matched Request / Reply ORBS and Command Vs. Action alternative proposal. (Johansson) Status: Pending
    • 38) 1/28/99 - Socket to Transport command set mapping document. (Batchelder, Fenelon) Status: Pending
    • 39) 3/1/99 - Integrate drawings, pwgpr49.pdf, idt_r01.pdf and pwgpro55.pdf by the next meeting. (Berkema, Johansson) Status: Pending
    • 40) 3/1/99 - Integrate ORB Sequence ID and History proposals. (Johansson) Status: Pending