RE: SM> Wed 10 May 1pm EDT - Semantic Model Teleconference

From: McDonald, Ira (imcdonald@sharplabs.com)
Date: Tue May 09 2006 - 22:24:45 EDT

  • Next message: Whittle, Craig: "SM> May 10, 2006 teleconference minutes posted"

    Hi,
     
    Pete and I chatted on the phone and resolved his issue with Subunits
    structure (he accidentally imported the wrong element - my bad docs).
     
    Please pull down the updated schema I just posted (and unpack them
    into the same directory you put Pete's recent SM ZIP file) to view a
    sketch of SM/2.0 that integrates everything in WIMS/1.0 with SM/1.0
    (except for the legacy Job.xsd in SM/1.0 - see release note).
     
    Particularly, you should pull down and look at:
     
      HYPERLINK
    "ftp://ftp.pwg.org/pub/pwg/wims/schemas/PwgSm-IM-20060509.pdf"ftp://ftp.pwg.
    org/pub/pwg/wims/schemas/PwgSm-IM-20060509.pdf
      - the exploded structured view of 'Server' from XMLSPY
     
    Oops, I see there's a typo in my release note for:
     
      HYPERLINK
    "ftp://ftp.pwg.org/pub/pwg/wims/schemas/PwgSm-IM-20060509.xsd"ftp://ftp.pwg.
    org/pub/pwg/wims/schemas/PwgSm-IM-20060509.xsd
      - note the correct 'PwgSm' (lowercase 'm')
     
    Cheers,
    - Ira
     

    Ira McDonald (Musician / Software Architect)
    Blue Roof Music / High North Inc
    PO Box 221 Grand Marais, MI 49839
    phone: +1-906-494-2434
    email: imcdonald@sharplabs.com

    -----Original Message-----
    From: owner-sm@pwg.org [mailto:owner-sm@pwg.org]On Behalf Of Zehler, Peter
    Sent: Friday, May 05, 2006 11:50 AM
    To: sm@pwg.org
    Subject: SM> Wed 10 May 1pm EDT - Semantic Model Teleconference

    All,

     
    On Wednesday May 10 there will be a Semantic Model Teleconference . This
    week we will continue focus on the updated straw man proposal for a PWG
    Semantic Model v2.0 Schema. Those of you who will not have access to
    MyMeetings access should have the updated schema available.

    If anyone has any items they would like to discuss please forward them to me
    and I will modify the agenda to include them.

    Date/Time:
    May 10 2006
    1 pm - 2 pm eastern
    Dial-In
    Tele-Con Number:1-866-365-4406
    PassCode: 2635888
    WebEx Meeting Details ( HYPERLINK
    "http://www.mymeetings.com"http://www.mymeetings.com):
    Meeting Number: 747275324
    Meeting Passcode: PwgSm
    Meeting Host: Peter Zehler
    Join Instructions for Instant Net Conference:
    1. Join the meeting now:
    HYPERLINK
    "http://www.mymeetings.com/xerox/nc/join.php?i=747275324&p=PwgSm&t=c"http://
    www.mymeetings.com/xerox/nc/join.php?i=747275324&p=PwgSm&t=c
    2. Enter the required fields.
    3. Indicate that you have read the Privacy Policy.
    4. Click on Proceed. If you have problems with the above link, go to
    HYPERLINK "http://www.mymeetings.com"http://www.mymeetings.com , select
    "join an event" and use the meeting number and passcode from above.

    Agenda: 1) Walk through the updated straw man schema < HYPERLINK
    "ftp://ftp.pwg.org/pub/pwg/Semantic-Model/Schema/PWG-SM-050506.zip"ftp://ftp
    .pwg.org/pub/pwg/Semantic-Model/Schema/PWG-SM-050506.zip>

                    2) Discuss Ira's new Subunits version that includes Finisher
    (See < HYPERLINK
    "http://www.pwg.org/hypermail/sm/0335.html"http://www.pwg.org/hypermail/sm/0
    335.html>)

                    3) Discuss alternatives to SubUnits schema structure
                    3) Discuss next steps and dates

    Pete

    I have created an updated version of the SM schema.
    A local version (i.e. relative links to schema files stored in the same
    directory) of the schema is available at
    < HYPERLINK
    "ftp://ftp.pwg.org/pub/pwg/Semantic-Model/Schema/PWG-SM-050506.zip"ftp://ftp
    .pwg.org/pub/pwg/Semantic-Model/Schema/PWG-SM-050506.zip>. I have included
    an XMLSPY project file.

    What I have done since the last update is
    1) Added the Ira's updated subunits as a peer of the services (e.g. Printer)

            a) included an alternative structures for subunits for discussion
    purposes
    What I have not done is
    1) Renamed the services to be consistent with WIMS
    2) Added WIMS (except for Subunits)
    3) Updated the master list of elements
    4) Done anything to the SM specification
    Pete
    Peter Zehler
    XEROX
    Xerox Innovation Group
    Email: Peter.Zehler@XeroxLabs.com
    Voice: (585) 265-8755
    FAX: (585) 265-7441
    US Mail: Peter Zehler
    Xerox Corp.
    800 Phillips Rd.
    M/S 128-25E
    Webster NY, 14580-9701

    --
    No virus found in this incoming message.
    Checked by AVG Free Edition.
    Version: 7.1.392 / Virus Database: 268.5.4/332 - Release Date: 5/4/2006
    

    -- No virus found in this outgoing message. Checked by AVG Free Edition. Version: 7.1.392 / Virus Database: 268.5.5/334 - Release Date: 5/8/2006



    This archive was generated by hypermail 2.1.4 : Tue May 09 2006 - 22:24:54 EDT