Hi,
[For review next Tuesday 9 February during PWG Face-to-Face]
I've just posted a Prototype draft of the PWG Imaging System Power MIB:
ftp://ftp.pwg.org/pub/pwg/wims/wd/wd-wimspowermib10-20100202.mib
- full ASN.1 source with compliance statements, defaults, references, etc.
ftp://ftp.pwg.org/pub/pwg/wims/wd/wd-wimspowermib10-20100202.pdf / doc
- full MS Word document with all sections completed
Note - The MIB source is unchanged from the 8 January version (except
internal date).
Cheers,
- Ira
---------------------------------------
Changes made to create 2 February 2010 version (Prototype Draft)
Editorial – Kept document status at Prototype
Editorial – Global – Bill Wagner reformatted entire document – thanks!
Technical – Added section 2.5 Operational State Terminology, per
Bill Wagner
Technical – Revised section 6 Conformance requirements to state that
Power Management Servers and Clients SHOULD implement the PWG
ISC MIB for reporting and querying the operational state of System and
Subunit components
--
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.