Hi,
Bill's slides for WIMS WG tomorrow say we should begin
working group last call right away on 1284 Command Set.
However the PWG Process/3.0 requires:
- a new draft at Prototype status
(bypassing Interim from current Initial status???)
- existence of a Prototype and a brief public report
(e.g., verification via MIB browser and summary slides)
- a new draft at Stable status
(updated for Prototype comments/issues)
- working group last call
(2+ weeks)
- PWG Last Call
(3+ weeks)
I have seen MIB walks that conform already
- more on this topic soon.
Cheers,
- Ira (editor of 1284 Command Set)
Ira McDonald (Musician / Software Architect)
Chair - Linux Foundation Open Printing WG
Blue Roof Music/High North Inc
email: blueroofmusic at gmail.com
winter:
579 Park Place Saline, MI 48176
734-944-0094
summer:
PO Box 221 Grand Marais, MI 49839
906-494-2434
--
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.