Please note that there has been very little response to the PWG Power Management documents last call. Please review these documents and submit your comments or a simple statement that you have reviewed the documents.
Although three documents are listed, please also respond if you have reviewed just one or two of the documents, indicating which document(s) you have reviewed and about which you may have comments.
The instructions below on how to respond are for ease of tracking. If, for some reason, you find it more appropriate to respond in a different way, please do so.
There was almost complete consensus that an Imaging Power Model was of top priority before this effort was begun. I realize that, with falling away of a major player, this interest may have subsided somewhat. But “Green” will be a critical consideration as the economy improves and a standard Power Management model will be an important part of that for hardcopy devices. Have a say in that standard; review the documents, make your comments, and cast a ballot when these documents come up for vote.
Thanks,
Bill Wagner (PWG WIMS WG Chair)
From: pwg-announce-bounces at pwg.org [mailto:pwg-announce-bounces at pwg.org] On Behalf Of wamwagner at comcast.net
Sent: Friday, October 08, 2010 7:34 PM
To: PWG announce
Subject: [Pwg-Announce] PWG Last Call of Power Model/MIB (8 October to 8 November)]
Greetings:
This PWG Last Call on the set of Imaging Power Management specifications will start today on Friday 8 October 2010 and will end on Monday 8 November 2010 at 10pm US PDT.
This is the formal announcement of the PWG Last Call for the PWG Power
Management Model for Imaging Systems and the companion PWG Imaging
System Power MIB concrete binding of this model, which are located at:
ftp://ftp.pwg.org/pub/pwg/wims/wd/wd-wimspower10-20100926.pdf <about:blank>
ftp://ftp.pwg.org/pub/pwg/wims/wd/wd-wimspowermib10-20100926.pdf <about:blank>
ftp://ftp.pwg.org/pub/pwg/wims/wd/wd-wimspowermib10-20100926.mib <about:blank>
All required and recommended element groups defined in these documents
have been prototyped by Samsung (except for the Meter group, that we raised
to Recommended per MPSA feedback). The prototype report is located at:
ftp://ftp.pwg.org/pub/pwg/wims/white/samsung-power-mib-prototype-october-2010.pdf <about:blank>
The WIMS WG has completed a working group last call of these documents
(without any further comments).
The PWG Process/3.0 requires that a quorum (30%) of PWG voting members
must acknowledge a PWG Last Call (with or without comments), before any
document can progress to PWG Formal Vote.
This PWG Last Call is NOT a Formal Vote but it DOES require your review
acknowledgment.
Please send your review acknowledgment *exactly* as follows:
To: <mailto:wims at pwg.org> wims at pwg.org
Subject: <Company Name> has reviewed Power Model/MIB and has [no] comments
Please do NOT simply reply to this note on the PWG-Announce list.
Note: The PWG Definition of the Standards Development Process Version 3.0
is located at:
<http://www.pwg.org/chair/membership_docs/pwg-process30.pdf> http://www.pwg.org/chair/membership_docs/pwg-process30.pdf
Best Regards,
- Bill Wagner (PWG WIMS WG Chair)
--
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.pwg.org/pipermail/pwg-announce/attachments/20101031/eed4c4da/attachment-0001.html>