Hi Pete,
No - the PWG Process/3.0 says the remaining steps are:
(1) Next draft should change Status from Interim to Prototype
(2) Email and teleconferences should discuss results of prototyping
(3) Next draft should change Status from Prototype to Stable
(4) Stable draft should go to Semantic Model WG last call
(5) Stable draft should go to PWG last call
Cheers,
- Ira
Ira McDonald (Musician / Software Architect)
Chair - Linux Foundation Open Printing WG
Co-Chair - IEEE-ISTO PWG IPP WG
Chair - TCG Embedded Systems Hardcopy SWG
IETF Designated Expert - IPP & Printer MIB
Blue Roof Music/High North Inc
http://sites.google.com/site/blueroofmusichttp://sites.google.com/site/highnorthinc
mailto:blueroofmusic at gmail.com
Christmas through April:
579 Park Place Saline, MI 48176
734-944-0094
May to Christmas:
PO Box 221 Grand Marais, MI 49839
906-494-2434
On Mon, Aug 22, 2011 at 8:25 AM, Zehler, Peter <Peter.Zehler at xerox.com>wrote:
> ** **
>> ** **
>> ** **
>> Peter Zehler
>> Xerox Research Center Webster
> Email: Peter.Zehler at Xerox.com> Voice: (585) 265-8755
> FAX: (585) 265-7441
> US Mail: Peter Zehler
> Xerox Corp.
> 800 Phillips Rd.
> M/S 128-25E
> Webster NY, 14580-9701 ****
>> ** **
>> --
> This message has been scanned for viruses and
> dangerous content by *MailScanner* <http://www.mailscanner.info/>, and is
> believed to be clean.
>> _______________________________________________
> mfd mailing list
>mfd at pwg.org>https://www.pwg.org/mailman/listinfo/mfd>>
--
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.pwg.org/pipermail/mfd/attachments/20110822/455305e4/attachment-0001.html>