Hi,
I have just posted an Interim draft of IPP System Control Service:
ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippsystem10-20140824-rev.pdf
- PDF with line numbers and redlines
ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippsystem10-20140824-rev.docx
- MS Word source with line numbers and redlines
This draft contains a *complete* list of proposed attributes for the
Description and Status groups in the new IPP System object,
including the proposed conformance and a rationale for every
REQUIRED or RECOMMENDED attribute.
Cheers,
- Ira
-------------------------------
Change History:
24 August 2014
- Interim draft
- corrected typos and wording
- revised section 5.3 and added Table 1 – Attributes in IPP System
Description group with notes for rationale of all conformance requirements
- revised section 5.4 and added Table 2 – Attributes in IPP System Status
group with notes for rationale of all conformance requirements
- added section 6 New IPP Operations (empty)
- added section 7 New IPP Attributes (empty)
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.pwg.org/pipermail/ipp/attachments/20140824/d445789e/attachment.html>