Hi,
I created the missing PDF versions and uploaded them.
Tom's PDF links below now work correctly.
Cheers,
- Ira
Ira McDonald (Musician / Software Architect)
Chair - Linux Foundation Open Printing WG
Blue Roof Music/High North Inc
email: blueroofmusic at gmail.com
winter:
579 Park Place Saline, MI 48176
734-944-0094
summer:
PO Box 221 Grand Marais, MI 49839
906-494-2434
On Fri, Sep 11, 2009 at 6:11 AM, Tom Hastings <tom.hastings at verizon.net> wrote:
> To the IPP WG,
>> I've uploaded the updated IPP Production Attributes Set 2 draft, v0.4 to the
> PWG FTP site for next Monday’s IPP WG meeting, September 14, 1-2 PM PDT =
> 4-5 PM EDT. (details below)
>>>> The following files are now available:
>> <ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippprodprintext10-v4-20090906.pdf >
>> <ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippprodprintext10-v4-20090906.doc >
>> <ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippprodprintext10-v4-20090906-rev.pdf >
>> <ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippprodprintext10-v4-20090906-rev.doc >
>> The –rev version has the changed text with change tracking that carries out
> the agreements reached at the September 1, IPP WG meeting. Red ISSUE
> comments indicate ISSUES to be covered at the meeting. Most of them are
> ISSUES to check each block of changed text to see if they are OK. The clean
> version is with the changes accepted.
>>>> See Change Log for details.
>>>> Peter will post the .pdf versions, since I don’t have Acrobat Professional.
>>>> Tom
>>>>>>>> ________________________________
>> From: ipp-bounces at pwg.org [mailto:ipp-bounces at pwg.org] On Behalf Of Tom
> Hastings
> Sent: Tuesday, September 01, 2009 15:00
> To: ipp at pwg.org> Subject: [IPP] I uploaded v0.3 of the IPP Production Printing Draft Set2
> with the agreements reached at today's meeting
>>>> I’ve uploaded the PWG IPP Production Printing Draft Set2 v0.3 with the
> agreements we reached today at the meeting written as MS-WORD comments. All
> 21 red ISSUES were resolved, so there are 34 green ISSUEs in the MS-WORD
> file v0.3. The file is at:
>>>>ftp://ftp.pwg.org/pub/pwg/ipp/wd/wd-ippprodprintext10-v3-20090901-rev.doc>>>> Next steps: I’ll prepare a v0.4 carrying out the 34 green ISSUE agreements
> with change tracking turned on. I’ll upload both –rev and change-tracked
> accepted forms in .doc and .pdf forms before the next Meeting, Monday,
> September 14, 2009, 4:00 PM PDT = 1:00 PM EDT.
>> The -rev v0.4 version will have all the change tracking from the v03 version
> only. Versions without the -rev are change accepted to make each version
> easier to read.
>> Tom
>>>> --
> This message has been scanned for viruses and
> dangerous content by MailScanner, and is
> believed to be clean.
>> --
> This message has been scanned for viruses and
> dangerous content by MailScanner, and is
> believed to be clean.
> _______________________________________________
> ipp mailing list
>ipp at pwg.org>https://www.pwg.org/mailman/listinfo/ipp>>
--
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.