Hi Tom,
Because I was working on Power Management Model yesterday,
I realized that the IPP PPSet2 spec still needs a required section
for any Prototype draft, per PWG Process/3.0:
3 Requirements
3.1 Rationale for IPP Production Printing Set2
3.2 Use Cases for IPP Production Printing Set2
3.3 Design Requirements for IPP Production Printing Set2
I volunteer to write a first draft, having written this section for
every PWG spec in recent years. IPP PSX has a good and
relevant example.
Actually, the PWG Process/3.0 requires a Formally Approved
Requirements spec BEFORE every new PWG standards-track
spec is approved - but the PWG Steering Committee allows this
to be satisfied by the embedded section 3 Requirements.
Cheers,
- Ira
Ira McDonald (Musician / Software Architect)
Chair - Linux Foundation Open Printing WG
Blue Roof Music/High North Inc
email: blueroofmusic at gmail.com
winter:
579 Park Place Saline, MI 48176
734-944-0094
summer:
PO Box 221 Grand Marais, MI 49839
906-494-2434
--
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.