Hi,
I've just posted another *Prototype* draft of HCD TNC Binding.
Note: This version is technically complete (i.e., stable content
with no outstanding editorial, mapping, or syntax issues). This
version is ready for prototyping.
The changes in this version were all based on IDS WG review
on 15 June 2015 of the previous version from 8 June 2015.
<https://wiki.strongswan.org/projects/1/wiki/TrustedNetworkConnect>
For prototyping and final review at IDS WG telecons.
http://ftp.pwg.org/pub/pwg/ids/wd/wd-idstnc10-20150615.pdf
- clean w/ line numbers
http://ftp.pwg.org/pub/pwg/ids/wd/wd-idstnc10-20150615-rev.pdf
- redlines w/ line numbers
Comments?
Cheers,
- Ira
---------------------
Change History
15 June 2015
Global – reviewed and accepted all changes from 8 June 2015 version, per
IDS WG
Editorial – Revised several sections to correct and accept minor typo
fixes, per IDS WG
Editorial – Revised section 9.1 note 2 to simplify wording, per IDS WG
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.pwg.org/pipermail/ids/attachments/20150615/e9d7fff2/attachment-0001.html>