attachment-0001


<br><font size=2 face="sans-serif">I would think that if it's really that hard to put down into words the</font>
<br><font size=2 face="sans-serif">the problems being solved (and what's required to solve these</font>
<br><font size=2 face="sans-serif">problems), then the resulting work product is probably not worth</font>
<br><font size=2 face="sans-serif">of being standardized in the first place.</font>
<br>
<br><font size=2 face="sans-serif">In the case of the PortMon MIB it should be pretty easy to</font>
<br><font size=2 face="sans-serif">list what the problem is with respect to the configuration of a network printer</font>
<br><font size=2 face="sans-serif">port on the client side and the installation of an appropriate printer driver, and</font>
<br><font size=2 face="sans-serif">to create a bulleted list of what needs to be part of the MIB to enable this.</font>
<br>
<br><font size=2 face="sans-serif">In the case of the Counter Spec. it should also be fairly straightforward to</font>
<br><font size=2 face="sans-serif">create a couple of paragraphs explaining what needs to be counted and</font>
<br><font size=2 face="sans-serif">why as far as the need for billing/fleet management metrics.</font>
<br>
<br><font size=2 face="sans-serif">I don't see this as a failure of the Process 2.0 since this was required in the</font>
<br><font size=2 face="sans-serif">original PWG Process document, I see it more as &quot;our&quot; failure to follow it.</font>
<br>
<br><font size=2 face="sans-serif">JT</font>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td>
<td><font size=1 face="sans-serif"><b>&quot;McDonald, Ira&quot; &lt;imcdonald@sharplabs.com&gt;</b></font>
<br><font size=1 face="sans-serif">Sent by: owner-pwg@pwg.org</font>
<p><font size=1 face="sans-serif">05/23/2005 03:19 PM</font>
<br>
<td><font size=1 face="Arial">&nbsp; &nbsp; &nbsp; &nbsp; </font>
<br><font size=1 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; To: &nbsp; &nbsp; &nbsp; &nbsp;&quot;'pwg@pwg.org'&quot; &lt;pwg@pwg.org&gt;</font>
<br><font size=1 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; cc: &nbsp; &nbsp; &nbsp; &nbsp;</font>
<br><font size=1 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; Subject: &nbsp; &nbsp; &nbsp; &nbsp;PWG&gt; SC topic - no requirements in Counter Spec or Port MIB</font></table>
<br>
<br>
<br><font size=2><tt>Hi,<br>
</tt></font>
<br><font size=2><tt>A topic for this Thursday's PWG Steering Committee:<br>
</tt></font>
<br><font size=2><tt>Both the PWG Imaging System Counters spec and the PWG<br>
Port Monitor MIB do _not_ have an internal requirements<br>
section. &nbsp;Without an explicit variance from the PWG SC,<br>
neither of these documents can enter Formal Approval<br>
(the PWG Process/2.0 has no loopholes here).<br>
</tt></font>
<br><font size=2><tt>On the other hand, the PWG Imaging Counter MIB _does_<br>
have an internal requirements section.<br>
</tt></font>
<br><font size=2><tt>Mea culpa - I should have realized this problem with<br>
both specs a long time back, but the question is, what<br>
to do?<br>
</tt></font>
<br><font size=2><tt>Cheers,<br>
- Ira<br>
</tt></font>
<br><font size=2><tt>Ira McDonald (Musician / Software Architect)<br>
Blue Roof Music / High North Inc<br>
PO Box 221 &nbsp;Grand Marais, MI &nbsp;49839<br>
phone: +1-906-494-2434</tt></font>
<br><font size=2><tt>email: imcdonald@sharplabs.com</tt></font>
<br>
<br>