attachment-0001


<br><font size=2 face="sans-serif">Here are the notes I took from the UP3i
Finisher review in San Antonio. If anyone present has anything to add or
correct, please do so. Then we can share these with UP3i and get feedback.
</font>
<br><font size=3 face="Times New Roman">1. Regarding UP3i request for “install
date” – what is it for? Firmware flash? Consider using hrSWInstalledDate.
</font>
<br>
<br><font size=3 face="Times New Roman">2. Populate element in the hrDevice
table for the Finisher.</font>
<br>
<br><font size=3 face="Times New Roman">3. Serial number – this can be
added to finGeneral group.</font>
<br>
<br><font size=3 face="Times New Roman">4. Device Name, Device Vendor Name,
Device Model, Device S/N are all in attribute table already in the Fin
MIB. Review for applicability. </font>
<br><font size=3 face="Times New Roman">a. If new attributes are needed
quickly, consider requesting IANA extend the list of Fin MIB attributes
rather than waiting for the counter MIB to complete. </font>
<br>
<br><font size=3 face="Times New Roman">5. Verification level – subunit
status? If not adequate… tell us what you want</font>
<br>
<br><font size=3 face="Times New Roman">6. We will entertain new finisher
alerts wherever they are not already covered (what finisher specific alerts
is UP3i looking for?)</font>
<br><font size=3 face="Times New Roman">a. Enums to IANA maintained MIB</font>
<br><font size=3 face="Times New Roman">b. No IETF involvement</font>
<br>
<br><font size=3 face="Times New Roman">7. Add new Fin device types, unwinder
etc. per requested.</font>
<br>
<br><font size=3 face="Times New Roman">8. Warning condition – we think
most or all of this is described by the generic subunit status. Many alert
codes have a fixed “critical” or “warning” association. &nbsp;Some
alerts are never critical (like paper low). UP3i should review and comment.
</font>
<br>
<br><font size=3 face="Times New Roman">9. Time units are in seconds throughout
in all our counters time units. It is usually part of the name. </font>
<br>
<br><font size=3 face="Times New Roman">10. MIB-II sysUpTime can be used
for power-on time but this is not in seconds. We don’t have power-on time
for a service nor are we modeling these (so far). These may be attributes
that we add to the Fin MIB, Fin attribute table OR put in the PWG counter
MIB/schema so any subunit anywhere can use it. Prefer counter MIB. </font>
<br>
<br><font size=3 face="Times New Roman">11. We don’t have any existing
counter with the semantics “run-time since first installation”. We need
the UP3i to elaborate so we know we get this addition right. </font>
<br><font size=3 face="Times New Roman">a. Is it calendar time since first
installation?</font>
<br>
<br><font size=3 face="Times New Roman">12. Is NumberOfOperations a request
for a generic counter unit (finisher operations) which is applied to each
finishing subunit? What if a stapler is stapling in two positions? How
many operations have occurred? Are you basically counting “kerchunks”?
Counting 2 staples in one operation would be contrary to how we count in
the counter MIB today (so far). </font>
<br>
<br><font size=3 face="Times New Roman">13. Number of operations since
consumable replacement. We would need to add this. Is this a resettable
counter? That may introduce difficulty.</font>
<br>
<br><font size=3 face="Times New Roman">14. Note: Counters associated with
a Service are for billing. Counters associated with a subunit are for maintenance,
replenishment etc. </font>
<br><font size=3 face="Times New Roman">a. Finisher Printer MIB subunit.
So we assume you are concerned with device level counters, not services.
Is this correct? </font>
<br>
<br><font size=3 face="Times New Roman">15. Ops since power on… reasonable,
we need to add.</font>
<br>
<br><font size=3 face="Times New Roman">16. Op unit. Op size – OK, need
to add.</font>
<br>
<br><font size=3 face="Times New Roman">17. Diameter in mm. We need to
consider as unit. Please explain use. </font>
<br>
<br><font size=3 face="Times New Roman">18. Time and Ops groups – We will
eval w.r.t. current counter MIB.</font>
<br>
<br><font size=3 face="Times New Roman">19. Load group. Foreign to us.
We would need to consider “loads” and how they relate to other aspects
of printing systems. Is this inherently roll centric?</font>
<br><font size=2 face="sans-serif">----------------------------------------------
<br>
Harry Lewis <br>
IBM STSM<br>
Chairman - IEEE-ISTO Printer Working Group<br>
http://www.pwg.org<br>
IBM Printing Systems <br>
http://www.ibm.com/printers<br>
303-924-5337<br>
---------------------------------------------- </font>