attachment-0001
<br><font size=2 face="sans-serif">The PWG Process document last call review
period ended at the Plenary meeting in Montreal in August. I have posted
the resulting PWG Process lcrc document including revisions to section
9 (Maintenance) which was the most significant last call comment fielded
at the Montreal meting. With this, the PWG Process document successfully
exits Last Call, now awaiting Formal Approval. Minor editorial comments
on the resulting draft will still be accepted.</font>
<br><a href="ftp://ftp.pwg.org/pub/pwg/general/process/lcrc-process20-20040831.pdf"><font size=2 color=blue face="sans-serif">ftp://ftp.pwg.org/pub/pwg/general/process/lcrc-process20-20040831.pdf</font></a>
<br><a href="ftp://ftp.pwg.org/pub/pwg/general/process/lcrc-process20-20040831-rev.doc"><font size=2 color=blue face="sans-serif">ftp://ftp.pwg.org/pub/pwg/general/process/lcrc-process20-20040831-rev.doc</font></a>
<br><font size=2 face="sans-serif">----------------------------------------------
<br>
Harry Lewis <br>
IBM STSM<br>
Chairman - IEEE-ISTO Printer Working Group<br>
http://www.pwg.org<br>
IBM Printing Systems <br>
http://www.ibm.com/printers<br>
303-924-5337<br>
---------------------------------------------- </font>