attachment-0001


<br><font size=2 face="sans-serif">I have posted the PWG Process document
with updates incorporated from the Washington D.C. April 21 f2f. The later
document (dated April 22) does not have revisions and, essentially, adds
the new PWG boilerplate and the Process Diagram. These will be reviewed
at our next conference call on</font>
<br><font size=2 face="sans-serif">Thursday - April 29</font>
<br><font size=2 face="sans-serif">Duration 1.5 hr. </font>
<br><font size=2 face="sans-serif">Time 11am MDT</font>
<br><font size=2><tt>Dial-in numbers:<br>
----------------<br>
 &nbsp; Toll Free: &nbsp;1-888-685-6850<br>
 &nbsp; Toll: &nbsp;1-719-884-4669<br>
Passcode:<br>
----------<br>
 &nbsp;Participant: 453876<br>
</tt></font>
<br><a href="ftp://ftp.pwg.org/pub/pwg/general/process/pwg-process20-20040421.doc"><font size=2 color=blue face="sans-serif">ftp://ftp.pwg.org/pub/pwg/general/process/pwg-process20-20040421.doc</font></a>
<br><a href="ftp://ftp.pwg.org/pub/pwg/general/process/pwg-process20-20040421-rev.pdf"><font size=2 color=blue face="sans-serif">ftp://ftp.pwg.org/pub/pwg/general/process/pwg-process20-20040421-rev.pdf</font></a>
<br><a href="ftp://ftp.pwg.org/pub/pwg/general/process/pwg-process20-20040422.doc"><font size=2 color=blue face="sans-serif">ftp://ftp.pwg.org/pub/pwg/general/process/pwg-process20-20040422.doc</font></a>
<br><a href="ftp://ftp.pwg.org/pub/pwg/general/process/pwg-process20-20040422.pdf"><font size=2 color=blue face="sans-serif">ftp://ftp.pwg.org/pub/pwg/general/process/pwg-process20-20040422.pdf</font></a>
<br><font size=2 face="sans-serif">----------------------------------------------
<br>
Harry Lewis <br>
Chairman - IEEE-ISTO Printer Working Group<br>
http://www.pwg.org<br>
IBM Printing Systems <br>
http://www.ibm.com/printers<br>
303-924-5337<br>
---------------------------------------------- </font>